← Back to Dispatch Index
Engineering4 min readVerified Production Field Note

Zero-Interruption WMS Integration: Connecting AMRs to Manhattan & SAP in Under 10 Days

How standard REST/gRPC message brokers and pre-built warehouse management hooks eliminate months of custom PLC programming.

Elena Rostova
Elena Rostova
Director of Software Systems

Moving Past Custom SCADA Protocols

The single greatest point of failure in warehouse automation has never been the mechanical joints — it is the digital handshake between the facility's Enterprise Resource Planning (ERP) or Warehouse Management System (WMS) and the robot control stack.

Historically, connecting a robot to a WMS required months of bespoke SCADA programming, proprietary OPC-UA drivers, and brittle field-bus wiring.


The BonafideR Fleet Gateway Architecture

BonafideR decouples physical kinematics from warehouse logic via a containerized on-premise edge gateway (BonafideR Core Broker):

[ Manhattan / SAP / Blue Yonder ]
             │ (HTTPS REST / Webhooks / AS2)
             ▼
[ BonafideR Edge Gateway (Docker/K8s) ]
             │ (Encrypted gRPC / Sub-millisecond)
             ▼
[ Autonomous Robot Fleet (LiDAR / SLAM) ]

Pre-Built Production Connectors

We maintain certified, bi-directional adapters for the industry's four leading supply chain platforms:

  • Manhattan Associates Active® Warehouse Management: Native pick-task queuing and dynamic aisle assignment.
  • SAP S/4HANA Supply Chain: Real-time batch confirmation, pallet inventory release, and goods receipt messaging.
  • Blue Yonder WMS: Automated container routing, wave dispatch, and cross-docking handover.
  • Plex Systems (Rockwell Automation): CNC workpiece loading feedback and spindle cycle telemetry.
  • The 10-Day Deployment Timeline

  • Day 1–2: Network Audit & VLAN Provisioning: Static IP allocation and dedicated industrial Wi-Fi / Private 5G validation.
  • Day 3–4: Mock Order Simulation: Replaying 100,000 historical pick orders through our digital twin environment.
  • Day 5–7: Shadow Mode Run: Robots shadow manual operators to confirm dynamic aisle pathing and dead-reckoning accuracy.
  • Day 8–10: Production Cutover: Full handoff with zero facility downtime.
  • Deploy Autonomous Fleets Without CapEx

    Our field engineers model your floor layout, cycle times, and WMS integration within 48 hours.

    Book a floor assessment ↗